For Capital Program Managers

Project controls built for public infrastructure delivery. Not adapted from something else.

AMP Essentials gives capital program managers the RFI logs, submittal registers, change order governance, risk tracking, and document controls they need — without building them in SharePoint or maintaining them in spreadsheets.

RFI & submittal registers Change order governance Pre-dispute cost capture Structured closeout 14 Patents Pending
What You're Dealing With

Managing public infrastructure projects in spreadsheets is a risk you're absorbing

Every RFI in a spreadsheet, every CO in an email chain, and every closeout scramble is a liability your program doesn't need to carry.

Your RFI and submittal registers live in spreadsheets

You maintain them, update them manually, and hope the contractor is tracking the same thing. When a dispute comes up, you're reconstructing the history from email.

Change order exposure isn't visible until it's too late

Pending changes accumulate informally until they're ready to execute. By then, the contingency conversation is already difficult.

Every project you manage runs on a different system

Your GC/CM program has one tracking approach. Your design-bid-build projects have another. Portfolio-level reporting requires manual reconciliation.

Closeout is always a scramble

The last 5% of a project takes 20% of the effort because documentation wasn't structured throughout. O&M manuals, as-builts, and warranty records are assembled at the end, not captured along the way.

What AMP Gives You

AMP Essentials — project controls that work out of the box

Structured registers, linked documents, and enforced workflows — purpose-built for public infrastructure delivery, not adapted from generic project management tools.

RFI log linked to drawing revisions and responsible parties

Track submitter, reviewer, response date, and disposition. RFIs linked to document library. Never lose the thread.

Submittal register with aging alerts

Scheduled vs. actual review dates. Aging alerts before reviews are overdue. Approval status tracked through the full review cycle.

Change order governance with pending exposure

Pending vs. executed separated from day one. Approval chain configurable to your authority matrix. Every CO traceable from first notice to execution.

Pre-dispute cost event capture

Document differing site conditions, directed changes, and disputed work at occurrence — before they become claims. Supporting records attached at the time of the event.

Document library with automatic links

RFIs and submittals link to documents automatically. Version control. Access scoped by role. No more digging through shared drives.

Structured closeout that enforces completeness

CMMS-ready asset records captured throughout the project. Closeout is a required workflow — not a checklist that gets skipped when schedule pressure hits.

Where AMP Fits Your Day

From reactive tracking to proactive program control

Instead of opening three spreadsheets every morning to check RFI status, submittal deadlines, and pending change orders, you open AMP Essentials. Everything you need to run your project is structured, linked, and current.

  • Open RFIs flagged before they age past your review deadline
  • Pending change order exposure visible the moment it's logged
  • Differing site conditions documented the day they occur — not reconstructed during dispute resolution
  • Closeout checklists enforced throughout delivery, not assembled in the final month
PMIS Readiness

How mature are your project controls?

The PMIS Readiness Score benchmarks your RFI management, change order governance, risk tracking, and closeout practices — and identifies where gaps are creating delivery risk.

Get Your PMIS Readiness Score →

Takes 5 minutes. No account required.

Book a Demo